Schedules that hold up — to reality on site and to scrutiny in a claim. We develop, review, recover, and optimise project programmes using industry best practice.

BASELINE PROGRAMME P6 · CPM CRITICAL PATH ACTIVITY MILESTONE
A programme is both a management tool and a contractual record. We build schedules that are realistic to deliver and robust enough to defend.

Good scheduling is not about producing a neat bar chart. It is about modelling how a project will actually be built — with sound logic, realistic durations, the right calendars and constraints, and a critical path you can trust.

We work with contractors, consultants, and owners to develop baseline programmes, interrogate existing ones, and put projects back on track when they slip. Every schedule we produce is built to withstand the scrutiny that comes later if delay or disruption becomes contentious.

The result is a single, reliable source of truth that supports day-to-day delivery decisions and protects entitlement at the same time.

What We Deliver

Planning capabilities

Applied individually or as an integrated planning service, depending on what your project needs.

Baseline development

Fully logic-linked baseline programmes built from first principles, with a clear schedule basis and methodology statement.

Schedule review & health checks

A close interrogation of programme logic, float, constraints, and critical path against DCMA 14-point and best-practice checks.

Recovery & acceleration

Practical recovery and acceleration plans when a project slips — re-sequencing and re-resourcing to get delivery back on track.

Resource & cost loading

Resource- and cost-loaded programmes that link the schedule to manpower, plant, and cash flow for credible forecasting.

Progress monitoring

Disciplined progress updates, look-aheads, and S-curves that surface variances early — before they become problems.

Schedule risk analysis

Quantitative schedule risk analysis (QSRA) to test completion dates against uncertainty and stress-test the critical path.

How We Work

Our approach

A structured method that turns project intent into a programme you can build to and rely on.

Discovery & basis

Scope, contract, deliverables, and constraints captured into a clear schedule basis.

Logic & sequencing

Activities, dependencies, and the build sequence modelled with sound network logic.

Resourcing & calendars

Durations, calendars, resources, and cost aligned to a realistic delivery strategy.

Baseline & QA

Critical path validated and the programme quality-checked before it is frozen.

Monitoring & updates

Progress tracked, variances flagged, and forecasts kept current through delivery.

What You Receive

Deliverables & tools

Clear, well-documented outputs your team and your contract administrator can rely on.

P6 baseline programme
Schedule basis & methodology statement
DCMA 14-point health-check report
Recovery / acceleration programme
Progress updates & S-curves
Schedule narrative & look-ahead
Primavera P6 Microsoft Project DCMA 14-Point Critical Path Method SCL Protocol

Need a programme you can trust?

Whether you are setting a baseline, reviewing a programme, or recovering a slipping project, TSconsult can help.